Words we use
Trade words on your quote and project page, in plain terms.
- Heat pump
- A machine that moves heat instead of making it. In winter it brings heat in from the outside air. In summer it takes heat out.
- Mini-split (ductless heat pump)
- A heat pump with an outdoor unit and one or more indoor units, joined by small lines instead of ducts.
- Indoor head (indoor unit)
- The part of a mini-split that hangs inside a room and blows warm or cool air.
- BTU and tons
- BTU is a measure of heat. Heating and cooling is sized in BTU per hour. One ton is 12,000 BTU per hour.
- Design load
- The heat a room needs on a very cold day for your area, or the cooling on a very hot one. Equipment is sized to cover it.
- ACCA Manual J
- The standard way to work out how much heat and cooling a home needs. ACCA is the trade group of air conditioning contractors that wrote it.
- Climate zone
- The energy code's map of U.S. climates, from hot (low numbers) to very cold (8). It sets how much heat a home needs.
- Refrigerant (and A2L)
- The fluid a heat pump moves between its units to carry heat. A2L refrigerants are newer ones that can burn a little, so installers get extra training.
- EPA 608 certification
- The federal card a tech needs to work on refrigerant. EPA is the U.S. Environmental Protection Agency.
- Line set (line run)
- The pair of covered copper tubes that carry refrigerant between the outdoor unit and an indoor unit. The line run is how far they go.
- Pre-charged (quick-connect)
- It comes from the factory already full of refrigerant. The lines click together, so no one works on the refrigerant at your home.
- HVAC
- Heating, ventilation and air conditioning. An HVAC license covers heat pump and furnace work.
- Breaker, amps and 2-pole
- A breaker is a switch in your panel that cuts power if a circuit draws too much. Amps measure current. A 2-pole breaker serves a 240-volt circuit and takes two spaces.
- kW and kWh
- A kilowatt (kW) is 1,000 watts of power. A kilowatt-hour (kWh) is that much power for one hour; it's what your electric bill counts.
- Level 2 charger
- A 240-volt home charger for an EV. It charges much faster than a regular outlet.
- J1772 / NACS
- The two EV charging plugs in North America. NACS is the plug Tesla started; J1772 is the one most other EVs have used.
- First-hour rating and UEF
- First-hour rating is how much hot water a heater can give in one busy hour. UEF is its federal efficiency rating; higher uses less energy.
- Standpipe
- The open drain pipe a washing machine empties into.
- Rough-in
- The first stage of an install: equipment mounted and lines run, before the final hookups.
- Commissioning
- Starting a new system and testing it, with the readings written down, to show it was put in right.
- Pressure and vacuum tests
- The tech fills new lines with nitrogen and watches for a drop, which would mean a leak. Then they pump out the air and water, checked in microns, before refrigerant flows.
- Permit
- Your city's OK to do the work, often with an inspection after. Who gets each permit is shown on your quote.
- Change order
- A written change to the job's work or price. Nothing extra is done or charged until you approve it.
- Allowances and not-to-exceed prices
- Some things can only be counted on site. Each has a set price per item and a cap, so the price can't go past the most you saw without your OK.
- Contractor of record and qualifier
- The licensed business that answers for the work by law. On Ducto that's always your installer, never Ducto. The qualifier is the license holder named for your job.
- SEER2 and HSPF2
- U.S. ratings for how much power a heat pump uses to cool (SEER2) and to heat (HSPF2). A higher number uses less power.
- DOE
- The U.S. Department of Energy.